This garden had no patio other than a little spot at the back. The drainage was also really bad because of the height difference,two days on the mini digger saw the whole area level then it was time to put the new drainage system in. Field drains and gullys allowed us to channel the water away from the bad spots and after visiting the client since the garden has seen plenty of rain it has proved a complete succes.The patio was then laid as soon as the main wall was complete,steps were built using a stone circle kit and a new coal bunker was built from the same bricks as the wall. The garden is now considerd part of the home and will be well used.
No comments:
Post a Comment